Must know the plasma fresh air system after installation of acceptance points

(Summary description)Must know the plasma fresh air system after installation of acceptance points

Must know the plasma fresh air system after installation of acceptance points

(Summary description)Must know the plasma fresh air system after installation of acceptance points

Information

With the improvement of people's living standards, the requirements for indoor air quality are also improving, because most of our time is spent indoors, the quality of indoor air quality directly determines our health quality. Therefore, many people will choose to install an indoor fresh air system, of which the plasma fresh air system is usually the choice.

Ceiling plasma air system, through the pipe fresh air to each room, ventilation effect is very convenient. But circuitry is unavoidable, drilling, plumbing, ceilings and other problems install it, and if you do all of those things, will you be okay with that? After the central ceiling is installed, it will close the ceiling, if there is a problem later, then fix it, but it is a more worrying thing. If you do not know the acceptance of a plasma fresh air system, how is the ceiling mounted installation qualified?
Acceptance includes the following several aspects: first, acceptance criteria, in strict accordance with construction drawings, open position should comply with the marking the location of the hole punch, you can change it should seek the party's consent, and should not break the main structure of the pores, avoids the wall when the main principles and designer to transform the walls of the opening,
Secondly, host acceptance criteria: host traction fixation using double nut form of host lifting lug should be fixed each vertical two nuts, and lock. Check that the connection between the main engine and the air pipe is tight, and if there is no gap, the main engine is connected to the hard pipe using an air hose connection. Test the running power to see if the host is running, if the air connected to the host duct is leaking, use the ears to see if there is excessive noise, noise will be similar to normal host exhaust fan noise. Check whether there is enough maintenance space, the host installation location, the host should not exceed the upper limit, observe whether there is a filter easy to remove and install.
Third, when accepting the pipe acceptance criteria for the plasma fresh air system, the outer surface of the pipe is first checked for a slit or scratch, and it must be checked for whether the pipe is tightly connected to the pipe. The plasma fresh air system power can be run, then coated with soapy water above the catheter, to check for air leaks in case.
Fourth, the outdoor air duct is led to receive the protective part of the outdoor pipe using a pipe cap or cover connected to the pipe pipe to prevent rain and dust from entering the pipe from the future mosquito air system effect.